2024-03-21 staff meeting

Quick release check in

  • What’s left to do?
    • Write + review release notes (Anish)
    • Test build from source Mac (Anish)
    • Docs changes (debug images, 3.12) (Brent)
    • Test upgrades (Pavish)
    • Review docs (Sean)
    • Scanning PR for red flags (Sean, Brent)
  • Who’s doing what?

Discussion

Moved to next release

  • Bump release publication atomic task to next release
  • Create requirements for better error logging

Left to do

  • QA is still in progress
    • Update docs to take out 3.12
    • Pavish testing upgrades
  • Sean reviewing docs

Action Items

Ghislaine is 0.1.7 release owner - update QA plan (also in template) - Sean will assist

Beta planning

  • Current status and next steps for:
    • Backend performance
      • Status:
        • Notes are drafted
        • Once we have buy-in, start building
          • GitHub issues for first step, replacing tables and columns endpoint with RPC endpoints
          • Sean will do frontend changes
            • We need to completely switch from REST to RPC in a single release for consistency
          • Then we’ll delete old code
        • Do we need to preserve old endpoints?
          • Not too much extra work
        • Frontend and backend needs to discuss how we’re going to make this change across multiple releases
          • We need to be on the same page about what we’re doing for each release
          • Also try to minimize work
        • We need to be able to track progress on this
          • Brent will create meta issue with bullet points (not all filled out), can change over time
      • Todos:
        • Kriti, Sean to review architectures notes
    • Usability improvements
      • Sean, Ghislaine, and Kriti did independent evaluations of moving CRM to Mathesar
      • We have a list of recommendations for improvements
      • Sean’s list
      • Ghislaine’s list
      • Conclusions
      • Want to improve navigation and space usage in record page; Ghislaine is working on wireframes.
        • Not blocking beta, but nice to have. Depends on capacity.
      • Blocking improvements are already done (Great!)
      • Found 2 more high-priority improvements that would be nice. Ghislaine is working on those.
      • We’ll continue to prioritize improvements from the original list as appropriate.
      • May find more things once we actually move the CRM over to Mathesar.
    • Release optimization
      • We should try to get the requirements for hiring someone to help with this done by mid-April if we can
      • Added task for Ansible script
      • Added task for manual QA plan
    • Permissions refactor
      • Done so far:
        • Architecture mostly solidified
          • Still have some things to go - how to derive permissions for Mathesar objects
          • Backend can go any which way
          • We’re all agreed that exploration permissions will be managed in the service layer
          • Ghislaine: Is this related to Mathesar table metadata?
            • Pavish would like to derive those from postgres permissions
            • Sean would like to derive from exploration permissions
              • Simpler to implement
        • Backend can do a few weeks worth of work without solidifying remaining issues
          • No schema level permissions yet other than through DB roles, we can add pieces once this UX is solidified
          • We will need to add pieces, but we don’t need to undo anything
        • Next step: UX exploration to finalize frontend implementation (and remaining backend architecture)
          • Pavish and Ghislaine had an initial call
          • Call to plan work / set expectations, put work in Basecamp
          • Kriti, Pavish, Ghislaine, Sean
      • Discussions:
        • Schema level permissions vs. not
        • UX requirements for permissions and how to present Mathesar metadata permissions
          • Considerations: https://hackmd.io/@mathesar/S1RjAC8pT
      • Backend work will be tracked in the same meta issue as backend performance (“backend refactor”)
    • Installation improvements
      • Not looking at these until backend refactor
      • Then we’ll look at this again
    • Beta “go to market”
      • Demo tasks
        • Try to do a bit every release
        • Should be part of demo planning
      • Metrics for beta
      • Marketing for beta
    • Planning and organization
      • Kriti: set up a call for the “go to market” of the beta
      • Kriti: check in on beta progress in weekly meetings as needed
  • Are we missing anything else?
    • Added to “other features to consider”
      • Security audit
        • Wait until backend refactor is closer to done
        • Should be outside audit
        • Sean was on CiviCRM security team
        • Table renaming bug could be related to security
          • We do sanitize on the backend
        • Security vulnerabilities should be tracked privately
        • We need a flow for people to report security issues with us
          • SECURITY.md file, etc.
  • Check in on everyone’s current work, ensure it’s aligned with beta
    • No time for full check in
    • If anyone is working on something that they don’t know if it’s a priority, please talk to Kriti
  • Timeline for beta
    • We should have a release that we’re aiming for being the beta
    • We’ll discuss this next week
    • Kriti will start an email thread to get people’s opinions on this
    • NOT April release
  • Plan for 0.1.7
    • Releases can be similar to cycles, all work should be tracked there
    • Talk about this next week
  • We’ve made a lot of progress since the last beta check-in, nice work everyone.

Action Items

  • Ghislaine to update QA plan for 0.1.7 release and release template in Basecamp
  • Sean and Brent will sync on the process plan for the architectural change.
    • Communicate plan to team afterwards.
  • Brent will create a metaissue to track overall plan for architectural changes.
  • Brent should double-check that backend performance plan makes sense.
  • Sean, Ghislaine, and Kriti should look through the Considerations doc, plan a call with Pavish.
  • Everyone: let Kriti know if you are working on something not prioritized for the beta
  • Kriti:
    • schedule “business goals for beta” meeting
    • start email thread about beta timeline
    • add beta timeline & 0.1.7 plan to next week’s meeting