Project Owner: Sean
Workers | Reviewers | |
---|---|---|
UX design | Sean | Ghislaine, Pavish |
Front end | Sean | Pavish |
Back end | Sean | Mukesh |
This project is a collection of smaller usability-related tickets that seem to present low-hanging fruit for improving UX.
Task | Work | Days | Deadline | Status |
---|---|---|---|---|
(Project start date) | 0 | 2023-03-29 | ||
Clipboard UX design | UX design | 5 | 2023-04-07 | ✅ Done: PR, Specs |
Copy from Mathesar, paste elsewhere | Front end | 3 | 2023-04-07 | ✅ Done |
Drag to select from active cell | Front end | 2 | 2023-04-14 | ✅ Done |
Selection stuck in drag mode | Front end | 1 | 2023-04-14 | ✅ Done |
Filtering via column header | Front end | 2 | 2023-04-14 | ✅ Done |
Persistent column widths | Full stack | 3 | 2023-04-21 | ❌ To do |
Resizable sidebars | Front end | 3 | 2023-04-26 | ✅ Done |
Persistent sidebar widths | Front end | 1 | 2023-04-26 | ✅ Done |
TSV serialization improvements | Front end | 1 | 2023-05-10 | ✅ Done |
Paste into cells | Full stack | 9 | 2023-05-10 | 🛑 Blocked by API work |
TOTAL TIME: 20 days (4 weeks)
(See work plan)